• Anglický jazyk

Heuristic Methods for Job Shop Scheduling

Autor: Muhammad Arul Zaini

As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this... Viac o knihe

Na objednávku

36.17 €

bežná cena: 41.10 €

O knihe

As a result, there are still some schedules that are not precise, causing a large make-span. In observations made on 5 products, the company requires a total production time (make-span) of 11 hours 54 minutes in completing production activities. In this research, scheduling evaluation is conducted to minimize make-span using the Active Schedule Generation algorithm, Non-delay Schedule Generation and Heuristic Schedule Generation Algorithm The approach used is to use a quantitative-comparative approach, namely research that compiles the calculation process to make comparisons between the results of the actual process with these methods. Therefore, the Heuristic Schedule Generation algorithm method was chosen as the best method and can be applied in the company to minimize the make-span.

  • Vydavateľstvo: LAP LAMBERT Academic Publishing
  • Rok vydania: 2021
  • Formát: Paperback
  • Rozmer: 220 x 150 mm
  • Jazyk: Anglický jazyk
  • ISBN: 9786204208473

Generuje redakčný systém BUXUS CMS spoločnosti ui42.