• Anglický jazyk

Impact of Project Delivery Methods on Texas Construction Projects

Autor: Navaneethan Rajan

Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state... Viac o knihe

Na objednávku

45.36 €

bežná cena: 50.40 €

O knihe

Competitive Bidding, Competitive Sealed Proposal, Construction Management Agency, Construction Management at Risk, Design-Build, Design-Build-Bridging, and Job Order Contracting are seven project delivery methods (PDM) that are commonly used in the state of Texas today. This book empirically compares the cost, schedule, and change order management performance of these project delivery methods (PDM) through in-depth analysis of selected construction projects that are chosen from the State of Texas by Engineering News Record (ENR) as the Best Construction Projects of the year 2009. Detailed information on research methodology, survey instrument, performance metrics, results, interpretations, and conclusions of the analysis are presented. Also presented are the "Lessons Learned", provided by the project participants.

  • Vydavateľstvo: LAP LAMBERT Academic Publishing
  • Rok vydania: 2012
  • Formát: Paperback
  • Rozmer: 220 x 150 mm
  • Jazyk: Anglický jazyk
  • ISBN: 9783848447978

Generuje redakčný systém BUXUS CMS spoločnosti ui42.