The implementation of the Furnas Hydroelectric Power Plant (MG)
Autor: Clésio Barbosa Lemos Júnior
The research that gave rise to this book, in 2008, aimed to study and analyze the repercussions caused by the implementation of the Furnas Hydroelectric Power Plant, located in the southwest region of the state of Minas Gerais. The repercussions were considered... Viac o knihe
Na objednávku
50.85 €
bežná cena: 56.50 €
O knihe
The research that gave rise to this book, in 2008, aimed to study and analyze the repercussions caused by the implementation of the Furnas Hydroelectric Power Plant, located in the southwest region of the state of Minas Gerais. The repercussions were considered to be both the processes of "de/re/territorialization", caused by the construction of the plant, and the tourist potential, which arose after the creation of the artificial lake formed by the damming of the waters.
- Vydavateľstvo: Our Knowledge Publishing
- Rok vydania: 2023
- Formát: Paperback
- Rozmer: 220 x 150 mm
- Jazyk: Anglický jazyk
- ISBN: 9786205951903